News summary
Ministry of Transport: A total of 2 charging piles along the highway have been builtcustomclaypokerchips.360,000 Securities Times e Company NewscustomclaypokerchipsGuo Sheng, deputy director of the Highway Bureau of the Ministry of Transport, said at a press conference today that the Ministry of Transport has accelerated the construction of a charging infrastructure system along the highway. So far, a total of...
Newsletter text
Ministry of Transport: A total of 23,600 charging piles have been built along the highway. According to Securities Times e Company News, Guo Sheng, deputy director of the Highway Bureau of the Ministry of Transport, said at a press conference today that the Ministry of Transport has accelerated the construction of charging infrastructure systems along the highway. So far, a total of 23,600 charging piles have been built. With the continuous improvement of charging facilities in the service area, the "energy replenishment anxiety" of electric vehicle owners on high speeds and long distances is gradually alleviating. This year, we will continue to guide all localities to accelerate the construction of charging facilities on the basis of completing annual work deployments, optimize layout and encrypt settings, and continuously meet the charging needs of electric vehicles for road travel.